Visited on September 21 without charging.
An eON charger has been installed on the concrete foundations I saw last time. This is most certainly the charger now visible on Monta/E-Mob. I was not able to confirm whether the DC connectors visible on Swisscharge before were the same charger, just hidden somewhere else around the builing, or something entirely different.
The larger gabarits are still there on the side of the building.
The AC charger is still there, with the same sign they installed next to every Swisscharge charger before the migration.
On E-Mob it says open 24/7, but the gate at the entrance was closed. I did not try to enter by car. Maybe there's an interphone where you could request access. At some point while I was there, someone must have opened the gate because a truck was waiting in front of the gate, and later it was no longer there, but I didn't notice it happening.
I walked in on foot to check out what was written on the chargers. The DC charger didn't have QR codes, but the contactless reader was working and offered as a payment option. 65ct/kWh, 75CHF reservation.
The AC matches with what was visible on older pictures online. Also 2 EV spots. The sign on the wall says max 4h. No reference to public/employee/visitors.