Visited on January 12, before it was operational.
At the time, a sign indicated "Inbetriebnahme Februar 2025". The charger has shown operational in the M-CHARGE app since 2025-02-26.
The 300kW unit was on the left, the 200kW on the right.
We also had pictures by elektrologisch on X from beginning January https://x.com/elektrologisch/status/1874824080186282147