The Evpass chargers outside have been migrated to Shell Recharge.
There is probably an error with the definition of the connectors.
On Evpass the chargers were listed at 11kW T2, 3.7kW T1. Now they are listed at 22kW T2, 7kW T1.
Charger number 1 was listed without T1 on Evpass, but it's now listed with a T1 on Shell Recharge. I'm assuming the numbers between Evpass and Shell match, and only indicated the second Shell charger with T1, but they could have switched them.