Visited on Friday without charging.
There are 3 charging stations with designated parking spots at the end of the row of public parking spaces.
It's not super clear whether those spots are also subject to the parking meter, because they have their own ban signs. The large ban sign says "ausgenommen Elektrofahrzeuge während des Ladevorgangs, max. 4 Std., gebührenpflichtig" and the small eCarUp sign below says "Gebührenpflichtige Ladestation", so is gebührenpflichtig referring to the parking, electricity, or both? If there wasn't the small sign it would seem to be for the parking but with both signs it's confusing. The spots are painted the same white color as the parking meter spots and they still have their parking spot numbers, so it seems likely they are still subject to the parking meter. There's no time component in the current eCarUp electricity price.
On the eCarUp pictures, we see that station 1 on the left had a sign saying max 4h above, and the other 2 spots had a sign saying max 8h. But those signs are gone and replaced with the ban sign described above, without any mention of maximum parking time.
The eCarUp markers and the QR codes contain the names Ladestation 1 / F25, Ladestation 2 / F26 and Ladestation 3 / F27 but I'm not sure what the Fxx values are reference to. It's not the parking spot numbers which are 73, 72 and 71. Is that the circuit breaker numbers? Why display them so prominently?