Just like Bern-Forsthaus, this location has been removed from GOFAST website.
It seems to have been migrated to MOVE, the new IDs were already visible for a while. The MOVE app doesn't give any more information, but I assume it's now taken over by EWB.
I can't find any communication about this change from either GOFAST or EWB. EWB website hasn't been updated, it still says the station is by GOFAST https://www.ewb.ch/angebot/mobilitaet/elektromobilitaet/oeffentliche-ladestationen.php
GOFAST-Niederwangen bei peyer bern, Wangenstrasse 102, 3018 Bern Max. Ladeleistung 100 kW DC via CCS, 60 kW DC via CHAdeMO sowie 43 kW AC via Typ 2. Zusätzlich DC Typ 2 Stecker (50 kW DC für Tesla)
Since the AC 43kW connector has been removed in November 2023 and the Tesla connector even earlier, I think we can assume that page has not been updated in a long time.
The switch appears to have been done as the same time as Bern-Forsthaus. In the live data, the Swisscharge IDs show a last session at round 7h in the morning, then available and disappear at the end of April 29. The MOVE IDs become active from April 29 around 16h.