Visited yesterday without charging.
I don't have a direct source of information for ChargeOne, but the charger was first visible in MOVE app as roaming on 2024-07-11 showing out of service, and then showing working starting on 2024-07-18. The AC connector only started being visible in roaming on 2024-08-21 but it was already visible in the ChargeOne API before, not sure why it didn't become visible at the same time.
The charger is an Alpitronic HYC_150. There is no contactless reader installed. There's only 1 parking spot with an EV symbol, but you could charge 3 cars on it. I'm not really sure who the other parking spots belong to, it seems to be an office for "Brügg Elektrizitäts-versorgung", so perhaps it's their employee parking lot? The spots might be free outside business hours, but it so happened that the only parking spot with a car on it was the one right next to the charger, preventing the use of the second CCS. With the cable manager, you might be able to double-park and still charge.
There was an eCarUp charger here before. There was a picture in the eCarUp app that confirms it was installed at the same place. It was a Mennekes with attached Type2 cable. There was a bollard in front of the charger. We still see the round mark at the edge of the concrete slab today. But the slab seems to have been extended and the panels added to the side. Previously it was all grass.
There's an EV sign in the grass next to the parking spot. I'm not sure where it's supposed to go. I don't see that sign in the eCarUp picture.