This location is listed on Chargemap with one CCS and one attached T2. The pictures confirm the list of connectors and show it's a HYC_50. It's listed as 75kW so there must be just one power module inside.
The charger seems to be networked via Eponet, but Eponet only broadcasts one CCS connector, listed as 70kW (at least in MOVE app). Not sure where the T2 connector is.
One of the Chargemap pictures shows the screen and there's an Eponet QR code on it, so it probably wasn't recently migrated but must have been on Eponet for a while or even since the beginning.