Visited on Thursday without charging.
The chargers are on the side of the building where Migrolino is located. This is inside of the area for the SOCAR gas station.
The contactless readers have been installed but are not yet active.
In my last post I mentioned that the charger had lost its "roof" at some point, it probably happened around August 2020 when the charger was swapped with another unit. I don't know why they had to switch it, as the new one had the exact same configuration, minus the roof. The original charger seems to have been later re-used in Bremgarten.
I wonder why the left charger is only rated for 100kW. The sticker on it says it's capable of 150kW and they have since added a 150kW charger next to it, so the grid connection always allowed enough current. The original charger moved to Bremgarten is now also 150kW, so it must have always been capable of it.
The light pole and camera next to the charger were not in the inauguration picture, but the pole is visible in a picture uploaded to Google Maps in November 2020, and the camera clearly visible in a picture of December 2020. We also see on that picture that the second charging spot is already prepped with a base for the charger.