Before the ABB charger, there was an EVTEC 20kW station here with CCS, CHAdeMO and AC.
There are pictures on the TFF-Forum. October 23, 2024 construction. October 29, ready and in use.
The parking spaces look identical to the current ones, so I don't think they were ever repainted since.
In the same corner where this Evite/MOVE charger is, there used to be a Tesla Roadster charger. We still see the electricity box in the background of my pictures, but I never checked if the Tesla charger was still there or just the industrial plugs.