Visited on May 20 and did a short charge.
There is a new contactless reader and it appears to work. First time I see a Payter terminal on an ABB charger. Usual MOVE tariff 0.57CHF/kWh AC and 0.69CHF/kWh DC. A bit stupid to not have updated the tariffs to the local rules. Since the signs say max 2h, it would have been more logical to apply the same limit, both to AC and DC.
I could not test payment because my card was blocked. Here I was getting a cryptic "refused by bank" message instead of the "insufficient funds" the Payter terminal at GOFAST would show me.
Because I couldn't authorize a contactless session, I was not able to confirm the order of the stations on the payment screen. It say 2: 50kW and 3: 50kW, without the connector name. I assume 2 is CCS based on the physical order, but I'll have to go back to test.
Still one space reserved for taxis.